Camlough Dam
Camlough Dam project involved strengthening the reservoir embankment to provide extra security in the event of heavy rainfall and the construction of a valve tower to control flows from the lake. This project consisted of refurbishing and upgrading of an existing embankment and spillway. The construction of a new Draw-off tower within the lake, installation of permanent sheet piles and grouting between the base of the sheet piles and rock.
A new reinforced concrete overflow weir, spillway and stilling basin were also constructed. A new wave wall formed along the crest and the size profile of the dam was increased. This project was designed to improve the facilities main purpose but in addition it has enhanced recreational and tourism resource for the future.